As changes occur to the street maintenance schedule, updates will be posted here.
Street Maintenance Program Schedule
2025/2026 Schedule
This is the page where you will find the schedule for the 2025–2026 fiscal year City Street Maintenance Program (CSMP). The schedule is being finalized and will be posted soon.
Residents (especially those in affected areas) are encouraged to check this page frequently. Here you’ll find information on which roads are planned for maintenance and updates on any delays or changes to the schedule.
For more information, visit the City Street Maintenance division page or the Slurry Seal / Micro Surfacing FAQ.
- To report a problem with street maintenance or roads, visit the Report an Issue page.
- If you have questions about CSMP, send an email to slurry@bullheadcityaz.gov.
- For urgent matters regarding CSMP, call 928-234-8752.
Update 2/10/2026 - Schedule posted
Update 2/10/2026 - Schedule posted
The schedule for city slurry work for week 17 has been posted.
Update 2/2/2026 - Slurry work cancelled
All city slurry work for this week, February 2 through February 6 has been cancelled due to unforeseen circumstances. We apologize for any inconvenience; new notices will be distributed once work has been rescheduled.
Update 1/31/2026 - Scheduled work cancelled
Due to unforeseen circumstances the following slurry work scheduled for Monday, February 2 will be cancelled:
Citrus Street from Karen Way to Church Street
Bluebonnet Boulevard from Hancock Road to Church Street
Lynn Drive from Baseline Road to Church Street
We apologize for any inconvenience. Work will be rescheduled over the following weeks.
Update 1/29/2026
Due to equipment damage the following roads scheduled for slurry work will be cancelled for 1/29/2026. These roads will be rescheduled in the following weeks:
Holly Street from Karen Way to Church Street
Lynn Drive from Hancock Road to Baseline Road
We apologize for any inconvenience and appreciate your understanding.
Update 1/27/2026 - Schedule posted
Update 1/27/2026 - Schedule posted
The schedule for city slurry work for week 17 has been posted.
Update 1/26/2026
Due to unexpected delays the following slurry work scheduled for today will not be completed. Work will be rescheduled on a later date and new notifications will be distributed.
Palo Verde Drive from Yale Drive to River Gardens Drive
We apologize for any inconvenience.
Update 1/23/2026 - Schedule posted
Update 1/23/2026 - The schedule for city slurry work for week 16 has been posted.
Update 1/13/2026 - Schedule posted
Update 1/13/2026 - The schedule for city slurry work for the week ISSA has been posted.
Update 1/8/2026 - Slurry work cancelled
Due to inclement weather conditions the following roads will not be slurried today:
Rio Grande Road from McAlister Drive to Downey Drive
Greenfield Drive from McAlister Drive to Ranch Road
Work will be rescheduled in the coming weeks
Update 1/6/2026 - Schedule posted
Update 1/6/2026 - The schedule for city slurry work for week 15 has been posted.
Update 12/30/2025 - Schedule posted
Update 12/30/2025 - The slurry schedule for Week 14 has been posted.
Update 12/30/2025 - Due to unforeseen circumstances the slurry work on Coral Reef Drive scheduled for 12/29/2025 was not completed. It has been rescheduled for Friday, January 2 2026.
Update 12/24/2025 - The slurry schedule for week 13 has been posted.
Update 12/16/2025 - Slurry schedule posted
Update 12/16/2025 - The slurry schedule for week 12 has been posted.
Update 12/9/2025 - Schedule posted
Update 12/9/2025 - The slurry schedule for week 11 has been posted.
Update 12/2/2025 - Schedule posted
Update 12/2/2025 - The slurry schedule for week 10 has been posted.
Update 11/25/2025 - Schedule posted
Update 11/25/2025 - The slurry schedule for week 9 has been posted.
Update 11/21/2025 - Today's scheduled slurry work will be cancelled due to weather. Roads will be rescheduled at a later date.
Update 11/19/2025 - Due to weather today's slurry work will be cancelled. All roads will be rescheduled at a later date.
Update 11/18/2025 - Schedule Posted
Slurry schedule for Week 8 has been posted. Please note there will be no slurry work Wednesday, November 26 through Friday, November 28 in observance of Thanksgiving.
Update 11/17/2025 - Slurry work scheduled for Tuesday, November 18 will be cancelled due to equipment malfunction and/or weather. Roads scheduled for this date will be rescheduled at a later time.
Update 11/14/2025 - Slurry work scheduled for Monday, November 17 has been cancelled due to equipment malfunction.
Update 11/13/2025 10:15 a.m. - The following roads scheduled for city slurry work on 11/13 have been cancelled due to equipment malfunction:
Rio Grande Road from Merced Drive to Harbor Place
Diamond Drive from Sea Spray Drive to Coral Reef Drive
Artesia Drive from Coral Reef Drive to Harbor Drive
We apologize for any inconvenience.
Update 11/13/2025 - City slurry work scheduled for Friday, November 14 will be cancelled due to equipment malfunctions. The roads planned for this day will be rescheduled in the following weeks.
Update 11/10/2025 - The schedule for city slurry work for week 7 has been posted.
Update 11/4/2025 - The slurry schedule for Week 6 has been posted.
Update 10/30/2025 - An additional road has been added to scheduled slurry work for Friday, November 7. Posted schedule has been updated.
Update 10/28/2025 - Schedule posted
Update 10/28/2025 - The schedule for Week 5 has been posted.
Update 10/21/2025 - The schedule for week 4 has been posted.
Update 10/14/2025 - Schedule Posted
Update 10/14/2025 - The schedule for Week 3 has been posted.
Update 10/9/2025 - Slurry work scheduled for Tuesday, October 14 through Friday, October 17 has been cancelled. All roads will be rescheduled at a later date.
Update 10/7/2025 - Due to mechanical issues the following roads scheduled for slurry work on 10/7 will be rescheduled:
Robson Cir E from Thunderbird Ln to 1970 Robson Cir E
Capistrano Lane N from Riverside Dr to the end of pavement
Update 10/7/2025 - Schedule Posted
Update 10/7/2025 - The schedule for Week 2 has been posted.
Update 10/6/2025 - Due to mechanical issues the following roads scheduled for slurry work on 10/6 will be rescheduled:
Robson Cir W from Thunderbird Ln to 1975 Robson Cir W
Meander Dr from Rio Grande Rd to Merced Dr
Update 10/3/2025 - Schedule Posted
Update 10/3/2025 - The schedule for Week 1 has been posted.